Follow the requirement. Inspect the evidence.

See how a design and development file connects the intended result, the design response, the supporting evidence and the next review decision.

An original synthetic industrial-grip program in the actual application. The design is Draft, verification is pending and no baseline has been approved.

01 / Product engineering

Give the design input a clear place.

The synthetic industrial grip must indicate when its latch is fully engaged. The input records the intended result, demonstration acceptance criteria and a verification strategy before the design moves into review.

Design input / acceptance criteriaInspect screen
Draft industrial-grip design input with latch-engagement acceptance criteria and verification strategy
Actual synthetic input, Draft v1. The demonstration criteria are recorded; risk classification and validation strategy are not yet recorded.
Design input / acceptance criteria

Scroll across and down to inspect the screen at full size. Press Escape or Close to return.

Draft industrial-grip design input with latch-engagement acceptance criteria and verification strategy
THE NEXT ACTION

Record the intended result, its owner and the evidence that will evaluate it.

THE CONNECTED RECORD

A design input with its context and acceptance criteria.

02 / Engineering and quality

Follow the input to the design response.

The matrix connects the latch requirement to a mechanical output and that output to an inspection. This demonstration covers two of six required trace links and exposes four informational gaps for the team to review.

Design control / trace coverageInspect screen
Actual synthetic design trace matrix with two of six links covered and four informational gaps
Actual synthetic trace: two of six required links covered, four informational gaps. A recorded link does not establish that verification passed.
Design control / trace coverage

Scroll across and down to inspect the screen at full size. Press Escape or Close to return.

Actual synthetic design trace matrix with two of six links covered and four informational gaps
THE NEXT ACTION

Review the linked output and the evidence represented in the trace. Investigate gaps and inconsistent relationships.

THE CONNECTED RECORD

A reviewable trace between the requirement, design work and supporting records.

03 / Verification owner and reviewer

Evaluate whether the evidence answers the requirement.

Open the verification section and follow the linked inspection. Its Draft state matters: the record is present, but a physical test has not been executed or accepted in this demonstration.

Verification / linked inspectionInspect screen
Verification section containing a linked inspection with Draft status
Actual synthetic verification section. The linked inspection is Draft; no passed test result is claimed.
Verification / linked inspection

Scroll across and down to inspect the screen at full size. Press Escape or Close to return.

Verification section containing a linked inspection with Draft status
THE NEXT ACTION

Examine the supporting record, its revision and applicability. Identify outstanding testing or documentation work.

THE CONNECTED RECORD

The evidence under review and the remaining questions attached to the design context.

04 / Authorized design reviewers

Review the proposed baseline with its history.

The design-freeze milestone is Pending, the current baseline is None and the archive is not ready for design freeze. Review the gaps and required participants before authorizing the next state. This custom demonstration profile has no configured requirement rules evaluated.

Design review / pending milestoneInspect screen
Draft design archive with no baseline and a pending design-freeze milestone
Actual synthetic review state: Draft archive, Custom profile, no current baseline, Pending design freeze. No approval or signature has been recorded.
Design review / pending milestone

Scroll across and down to inspect the screen at full size. Press Escape or Close to return.

Draft design archive with no baseline and a pending design-freeze milestone
THE NEXT ACTION

Assess readiness and the applicable design review. Retain the decision against the records it concerns.

THE CONNECTED RECORD

A visible review state, outstanding work and the responsibility for the next authorized decision.

The next decision has a traceable basis.

The team can inspect the requirement, design response, draft verification and trace gaps together. The record makes the remaining work visible before a reviewer approves a baseline.

Start with your workflow

See this workflow with your team.

Tell us about the records, people and decision involved in your process. We will frame the walkthrough around that work.

Walk through your design review